Data Centres & Telecoms Heaters

Whether newly built or recently refurbished, data centres or server rooms are expected to run continuously and reliably. Prior to the data centre going live the air-conditioning system should be tested at a variety of load levels, working up to 100 percent load as well as testing the infrastructure by mimicking the characteristics of the IT equipment as closely as possible.

This ensures you can keep the ideal environment for your critical equipment and create the high-climatic temperatures required to test your infrastructure works to perfection.

Would you like to refine your results?

  • Facebook
  • Twitter
  • linkedin
  • youtube